HomeGame GuidesSherman Hill SD70ACE Startup Guide - Train Sim World® 2

Sherman Hill SD70ACE Startup Guide – Train Sim World® 2

Published on

ADVERTISEMENT

By tompallen

This guide provides the same basic information contained in the first part of the SD70ACE tutorial included with the Sherman Hill route, allowing users with a second monitor to display the guide alongside TSW2. A further guide covers the second part of that tutorial: Changing ends.

Step 1

If you’re not already in the SD70ACE’s cab, enter the engine.

Step 2

Sit in the engineer’s seat.

Note: some startup procedures involve controls located on the back wall of the cab. While these can be accessed while seated, standing up and walking to the back wall strikes me as more realistic.

Step 3: Begin Start Engine Procedure: Isolation Switch

On back wall: Set Isolation Switch to START.

Step 4: Fuel Pump

Set FUEL PUMP switch to ON (click switch).

Step 6: Isolation Switch

Set Isolation Switch to RUN.

Steps 7 and 8: Generator Field and Engine Run switches.

Set Generator and Engine Run switches to ON.

Step 9: Reverser Handle

Insert Reverser Handle.

Section 10: begin confirm brake setting procedures.

On Back wall: set Dynamic Brake Switch to CUT IN.

Step 11: Access More Options Screen.

Access More Options Screen by clicking indicated button.

Step 12: Access Operator Controls screen.

Click indicated button to access Operator Controls screen.

Step 13: Set air brakes to Lead.

Set Air Brakes to Lead by clicking indicated button.

Step 14: Set Air Brakes to Cut In.

Click indicated button to set air brakes to Cut In. This completes brake configuration.

Step 15: Automatic Brake.

Set Automatic Brake to Release.

Step 16: headlights.

Set headlights to bright by rotating switch (or pressing >H< key)

Step 17: Set Reverser to direction of travel.

Use mouse or keys (>W< forward; >S< reverse) to set reverser.

Step 18: Apply power.

Apply power using mouse or keys (>A< to increase; >D< to decrease).

Latest articles

Five Nights at Freddy’s Movie Set for 2023 Production Start –

Death by animatronics will hit the big-screen as Blumhouse’s adaptation of standard horror video...

Genshin Impact: Key of Khaj-Nisut – find out how to get it, stats, and ascension supplies

The Key of Khaj-Nisut is a 5-star weapon added in Genshin Impact Version 3.1....

Nerdle October 6 2022 Answer (10/6/22)

While most individuals try to place collectively 5 letter phrases, there’s now...
ADVERTISEMENT

More like this

Five Nights at Freddy’s Movie Set for 2023 Production Start –

Death by animatronics will hit the big-screen as Blumhouse’s adaptation of standard horror video...

Genshin Impact: Key of Khaj-Nisut – find out how to get it, stats, and ascension supplies

The Key of Khaj-Nisut is a 5-star weapon added in Genshin Impact Version 3.1....

Nerdle October 6 2022 Answer (10/6/22)

While most individuals try to place collectively 5 letter phrases, there’s now...